Show simple item record

dc.contributor.authorMitchell, C.
dc.date.accessioned2020-10-10T19:43:20Z
dc.date.available2020-10-10T19:43:20Z
dc.date.issued2020
dc.identifier.citation

Mitchell, M. (2020) ‘Investigation into the process of cured-in-place pipe sewer rehabilitation’, The Plymouth Student Scientist, 13(1), p. 290-327.

en_US
dc.identifier.urihttp://hdl.handle.net/10026.1/16514
dc.description.abstract

Sewer networks affect the entire world with the ability to bring clean streets to cities which may otherwise be completely disease-ridden. Ageing sewer networks present a problem, but new technologies are paving the way for rehabilitation. Trenchless repair options such as CIPP (cured-in-place pipe) liners are one such option. This paper aims to evaluate the full process that precedes and proceeds the installation of a CIPP liner for the rehabilitation of a defective sewer with the aim of finding potential solutions to the current concerns and to streamline the full CIPP method. Further inspection was conducted into the testing practises for CIPP liners to see any fundamental failures and their impact on failure behaviours. Primarily thickness, flexural strength testing and electron microscopy imaging has been carried out with results showing a large range of differences between samples in all aspects of testing. The focus for improvement based off analysis of the testing leans toward creation of a data management tool which would make all sewer pipe data accessible from one source, helping streamline processes and ensuring the features of the pipe were up to-date alongside documenting and recording any work that has been completed.

en_US
dc.language.isoenen_US
dc.publisherUniversity of Plymouthen_US
dc.rightsAttribution 3.0 United States*
dc.rights.urihttp://creativecommons.org/licenses/by/3.0/us/*
dc.subjectCured-in-place pipeen_US
dc.subjectTrenchless repairen_US
dc.subjectPipe repairen_US
dc.subjectSewer rehabilitationen_US
dc.subjectCIPPen_US
dc.subjectFlexural strengthen_US
dc.subjectLiner repairen_US
dc.subjectWinCanen_US
dc.subjectSewer networksen_US
dc.titleInvestigation into the process of cured-in-place pipe sewer rehabilitationen_US
dc.typeArticleen_US
plymouth.issue1
plymouth.volume13
plymouth.journalThe Plymouth Student Scientist


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

Attribution 3.0 United States
Except where otherwise noted, this item's license is described as Attribution 3.0 United States

All items in PEARL are protected by copyright law.
Author manuscripts deposited to comply with open access mandates are made available in accordance with publisher policies. Please cite only the published version using the details provided on the item record or document. In the absence of an open licence (e.g. Creative Commons), permissions for further reuse of content should be sought from the publisher or author.
Theme by 
Atmire NV